The Warradarge Wind Farm commenced commissioning in August 2020. Pre-construction studies indicated that the wind farm was low risk for bird and bat strikes and would have an insignificant impact on local and regional populations (Biota, 2012). Any bird or bat strikes that are identified by wind farm maintenance personnel are recorded, collected and reviewed to determine species. No strikes were recorded in 2020, a total of six bird strikes in 2021, one bat and three bird strikes during 2022, and four bird strikes in 2023, none of which were identified to be conservation-listed species. An additional monitoring program is proposed in coming years to provide further validation of any avifauna mortality caused by the wind farm operation.